|
Build Your Online Product Catalogs?
Product Name: |
Floor type Freeze Dryer precautions before the experiment
|
Supply Ability: |
|
Related proudcts |
lyophilization equip, floor model manifold, |
Specifications |
Freeze-dried rose |
Price Term: |
|
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
Floor type Freeze Dryer precautions before the experiment: 1. First make sure that the samples that need to be lyophilized have been pre-frozen. The sample to be dried can be placed in a low-temperature refrigerator or liquid nitrogen to freeze the product completely. The longer the time, the better the freeze-drying effect. The reason for pre-freezing is that the sample must be lyophilized in the solid state (freezing state). 2. Install the condensation chamber on the main unit, with a section of the seal ring on top, then add the base plate to the condensation chamber, paying attention to the protruding end facing up, then adding the adjustment plate to the top, and then installing the ring current. For the socket, it should be noted that the grooved portion on the side of the adjustment disc should correspond to the groove on the annular current socket (use the magnet to move the adjustment disc). If the metal block used with the magnet can not be taken down, it can be attached to the side of the fuselage and then removed. 3. Next, put the brackets, material trays, and then the drying bins in the top. 4. Then connect the floor type Freeze Dryer to the vacuum pump with a vacuum tube. The joints are made of international standard clamps. There is usually a sealing rubber ring in the clamp. Before connecting, apply a proper amount of vacuum grease on the rubber ring, which can protect the rubber ring and then clamp it with a clamp. Before each start-up, first check whether the pump oil in the vacuum pump is sufficient. ****** Use the ******. Look at the instructions for the vacuum pump. Different vacuum pumps may have different requirements. But not oil-free operation, the oil level should be at 2/3. 5. Check all the external bottle valves to confirm that they are in the closed state (big head up), check whether the exhaust valve is closed, close the vacuum drain valve, unscrew the drain valve, and let the residual water flow out. Tighten the valve after draining. 6. Check if the contact part of the freeze- |
Company: |
Beijing Songyuan Huaxing Technology Development Co., Ltd.
|
Contact: |
Mr. tingting cheng |
Address: |
Room 706 Tower C, Changyin Building |
Postcode: |
100000 |
Tel: |
01058895377 |
Fax: |
01058895377 |
E-mail: |
|
|
|
|